日批在线观看,亚洲精品影院,午夜精品久久久久久久久久久久,亚洲精品久久,久久亚洲国产精品无码一区,亚洲高清AV,欧美午夜精品久久久久免费视,日韩精品久久久

Company News
For the Clear Water of the River—Luzhou Laojiao Wine Making Co., Ltd. Wastewater Treatment Station Upgrade Technical Transformation Project Passed Acceptance
  • 2019/12/31
  • From:Chengdu Engineering Co., Ltd. of China Light Indus

Project Background: Located in the upper reaches of the Yangtze River, Luzhou city is the confluence of the Yangtze River and its tributary Tuojiang River. Water pollution will seriously affect the middle and lower reaches of the Yangtze River. Sewage discharge and treatment has become a long-term problem in Luzhou Laojiao wine making base.

 

On December 9, 2019, the technical transformation project of the sewage station of Luzhou Laojiao designed by our company’s overseas engineering department successfully passed the inspection and acceptance of the government functional authorities, and passed the internal acceptance of Luzhou Laojiao on December 19, 2019.


This project is an EPC project jointly contracted by our company and Sichuan Industrial Equipment Installation Company. Our company is mainly responsible for the engineering design of this project.


The project is located in the original sewage treatment station of Luzhou Laojiao, Luohan Town, Longmatan District, with a daily treatment scale of 2000m3/d. The project is carried out in the original station for technical renovation, so there is a shortage of land and many restrictive factors for renovation. The composition of in-fluent water is complex. There are high concentration of organic matter in waste water, uneven water quality and water quantity, and less waste water output when production is stopped every year. In addition to meeting the sewage treatment process that meets the sewage treatment standards, the design must also comprehensively consider the use of the first phase of construction during the high temperature shutdown period (July to August each year) and the second phase of construction during the production period after the recovery period.

  圖片1.jpg

A View before Renovation


The process of this project adopts advanced automatic control scheme, adopts hierarchical and distributed control mode for each process unit, and carries out centralized control in the control room, so as to ensure the concentration, stability and reliability of sewage treatment. The designed water quality requirements shall meet the direct discharge standard in Table 3 of the "Water Pollutant Discharge Standard for Fermented Alcohol and Liquor Industry" (GB27631-2011). During the trial operation, the final discharge concentration is lower than the discharge limit.


The sewage station upgrading technical transformation project of Luzhou Laojiao successfully reached the standard and put into production, setting an industry benchmark for sewage treatment in the liquor industry, and also sending the best gift for the clear water of the river in 2020.

 

圖片2.jpg

圖片3.jpg

Scene View of the Construction 

冀州市| 南平市| 云阳县| 阜康市| 谢通门县| 桐梓县| 汕尾市| 乐安县| 安平县| 陇南市| 北流市| 即墨市| 游戏| 易门县| 海安县| 延庆县| 象州县| 白城市| 屏山县| 拜泉县| 福泉市| 林西县| 靖西县| 车险| 星子县| 左贡县| 平山县| 高唐县| 桑日县| 浮山县| 西峡县| 咸阳市| 龙胜| 鸡东县| 长乐市| 贵阳市| 精河县| 交城县| 通榆县| 昌乐县| 团风县|